Residential electrical · Belleville & Quinte
Electrical Panel Upgrades in Belleville
60 and 100 amp services brought up to 200 amp. Fuse boxes replaced. Permit and ESA inspection included in the price.
Old fuse box beside the new 200A service
Signs your panel is undersized
Most people don’t think about their electrical panel until something goes wrong. These are the things that usually bring homeowners to us:
- Lights dim when a large appliance kicks on
- Breakers trip regularly, or you’ve started avoiding running two things at once
- You still have a fuse box rather than breakers
- Your insurer has asked about the service size
- You’re adding an EV charger, a hot tub, air conditioning, or finishing a basement
- The panel is warm, buzzing, or smells like burning plastic
That last one is different from the rest. It isn’t a planning problem, it’s a now problem — shut the main off if you can reach it safely and call us.
Local note — needs client input
This is where a page written by someone who actually works in Belleville says something no national site can. Which subdivisions went in with 100 amp services and which got 200. Which panel brands turn up in which decade of local housing. Whether the older streets near the Moira are still on overhead service.
That detail is what makes the page rank and what makes it worth reading. It needs to come from the client, not from us.
What the work involves
A panel upgrade is a one-day job in most homes.
We file the ESA notification before we start and book the disconnect with your utility. On the day, the power comes off at the meter, the old panel comes out, and the new one goes in. If the service mast, the meter base or the ground need replacing to bring the whole service up to current code, that happens at the same time — there is no point putting a new panel on a forty-year-old mast.
Then every circuit gets landed on its own breaker and labelled properly. Not “kitchen?” in pencil. Actually labelled.
Power is off for roughly four to six hours. We tell you the window in advance.
The inspection happens after. The ESA inspector comes out, checks the work, and issues the Certificate of Inspection. You don’t need to do anything for that except be home to let them in.
What we usually find once it’s open
Old panels hide things. The three that come up most:
- Aluminum branch wiring, in houses from the mid-60s to the mid-70s. It changes how the connections at the panel have to be made. See aluminum wiring repair.
- Knob and tube spliced into newer wiring somewhere upstream. Common in pre-1950 houses and it usually means a bigger conversation.
- Double-tapped breakers — two wires under one screw. Cheap to fix while the panel is open, annoying to fix later.
If we find any of it, we stop and call you before spending your money. That is the whole point of a fixed price.
Timeline
- Day 1 — site visit, load calculation, fixed written quote
- Day 2–5 — ESA notification filed, utility disconnect booked
- Day 6 — the work, six to eight hours on site
- Within 10 days — ESA inspection and your Certificate of Inspection
Two weeks from first call to certificate is normal. It can be faster if the utility has a slot. It cannot be same-day, and anyone who tells you it can is not filing a permit.
What it costs
A straightforward 100 to 200 amp upgrade in Belleville runs $2,400 to $3,800 including the permit and the inspection.
Replacing an old fuse box costs more, usually $2,900 to $4,200. Not because the box is harder to remove, but because the wiring at the box is often in worse shape than the box itself, and some of it has to be made good before anything can be connected to a new panel.
What moves the price inside those ranges:
- How far the panel sits from the meter. Every metre of new service cable costs.
- Whether the mast and meter base need replacing, which they usually do on anything pre-1980.
- Whether the walls are plaster or drywall, because plaster is slower to open and slower to make good.
- Whether we find aluminum branch wiring once we’re in there.
- Whether the panel is moving to a new location, which some insurers and some renovations require.
We’ll tell you which of those apply to your house before we quote, not after we’ve started.
What we don’t do
We don’t sell you 400 amp because it sounds safer. We don’t quote a panel upgrade when a sub-panel would do. And if your service is fine and the real problem is one overloaded circuit, we’ll say so — it’s a much smaller bill and you’ll call us again.
Common questions
Do I need a permit for a panel upgrade in Ontario?
Yes. A service change is notifiable work under the Ontario Electrical Safety Code, which means a notification has to be filed with the Electrical Safety Authority before it starts. We file it, we meet the inspector, and the permit fee is inside the price we quote you. When it passes you get a Certificate of Inspection. Keep that — your insurer may ask for it, and a buyer's lawyer almost certainly will.
How long will my power be off?
Four to six hours for a straightforward swap. We book the utility disconnect for the morning and we tell you the window in advance so you can plan around it. Most people work somewhere else for the afternoon. Fridges and freezers hold fine for that long if you leave them shut.
Will my insurance company want to know?
Tell them once it's done. Insurers in Ontario ask about service size and panel age on older homes, and some load extra premium or refuse cover on a 60 amp service or a fuse box. Sending them the Certificate of Inspection is usually enough. We can't tell you what your premium will do — ask your broker before you book the work if that is the reason you're doing it.
Is 200 amp enough, or should I go bigger?
For almost every house in Belleville, 200 amp is enough — including an EV charger and a heat pump. We do a load calculation before quoting so this is a number rather than a guess. Going to 400 amp makes sense on a large home with electric heat, a shop, a pool and two vehicles charging, and almost nowhere else. It costs considerably more and most people who ask for it do not need it.
My panel is full. Do I need a whole new one?
Not always. If the service itself is 200 amp and healthy, sometimes a sub-panel or tandem breakers will do — cheaper and quicker. If the service is 60 or 100 amp, or the panel is a brand with a known history, adding to it is throwing money at the wrong problem. We'll tell you which you have before we quote.
Related work and reading
Get a quote
Tell us what's going on.
Fill this in and we'll get back to you the same business day. If it's an emergency, call instead — the form doesn't wake anyone up.
Phone
Hours
[[HOURS]]
Not sure if you need one?
We'll come out, open the panel, and tell you honestly. If it can wait five years we'll say so.